See If Your Route Qualifies
DriveMod Tugger EasyLaunch™
The four routes that qualify most often include Milk Run Replenishment, Line-Side Delivery, End-of-Line to Staging and WIP Transfer Loop.
What's the purpose of the trip?
Restock several work areas from storage, over and over
Keep a production line fed with parts and materials
Move finished goods off the line to staging or the warehouse
Shuttle work-in-progress between cells or process steps
What can be seen on the route?
Tuggable carts
Palletized loads
Both carts and pallets
Other, a mix of stuff
Back
How often does this trip run?
Constantly — all shift long
Several times an hour
A handful of times a day
It varies day to day
Back
Biggest problem with this route?
People stuck hauling instead of higher-value work
Too much traffic on the floor
Inconsistent or unpredictable timing
It just eats hours
Back
Last step, get your results!
Please enter your full name and a valid work email.
Back
See My Results
Calculating your results
Calculating your results
Calculating your results
Calculating your results
Benefits of Deploying Cyngn AMRs
Real Results From Real Customers
With swift payback periods, businesses see significant savings and ROI in months, through reduced downtime and improved productivity.
Building Materials Manufacturer
$4M
Total Loss Avoidance12 Months
Payback PeriodOEM Parts Distributor
$1.75M
Total Loss Avoidance21 Months
Payback PeriodHVAC Manufacturer
$1.2M
Total Loss Avoidance16 Months
Payback PeriodConsumer Packaged Goods
$945K
Total Loss Avoidance15 Months
Payback PeriodLior Tal
CEO, Cyngn
"On average, companies that deploy our Autonomous Tuggers have seen a 33% increase in productivity, a 64% reduction in labor costs, and an 18-month payback period."